Home ISO 27001 Annex A 5.22
ISO 27001:2022 · Annex A 5.22

ISO 27001 Annex A 5.22 – Monitoring, Review and Change Management of Supplier Services

ISO 27001:2022 Annex A 5.22 requires you to regularly monitor, review and evaluate a supplier's security practices and service delivery after signing, and to manage changes to them — not just review the supplier once at onboarding.

ISO 27002:2022 control attributes
Control type
Preventive
Information security properties
Confidentiality Integrity Availability
Cybersecurity concepts
Identify
Operational capabilities
Supplier_relationships_security Information_security_assurance
Security domains
Governance_and_Ecosystem Protection Defence

What Annex A 5.22 actually requires

Control 5.22 governs the phase most supplier-risk programmes underinvest in: the period after a contract is signed. The security posture you assessed during due diligence is a snapshot. Suppliers rotate subprocessors, move data to new regions, let certifications lapse, get acquired, and quietly edit their data-processing terms. The control requires you to monitor, review, evaluate and manage change — so that the level of security agreed in the supplier agreement (control 5.20, under the overall approach set by 5.19) is actually sustained over the life of the relationship.

Monitoring in practice

Monitoring is the continuous, low-latency activity: watching service delivery and the supplier's security posture between formal reviews. In practice it means tracking performance against agreed service levels, reviewing the supplier's service reports and incident and breach notifications, following up independent audit reports, and keeping eyes on the supplier's publicly stated commitments — their subprocessor list, DPA, privacy and security policies. The purpose of monitoring is to shorten the gap between a change happening at the supplier and you knowing about it.

What a review must produce

A review is the periodic, deliberate assessment — and in an audit what counts is the record it produces, not the meeting. A defensible supplier review record captures the date it was performed and who performed it; the evidence examined (service reports, current certifications, audit or penetration-test summaries, incident history); the findings and any gaps against the agreement; actions raised with owners and due dates; and a residual-risk decision. Without that dated record, you cannot later prove the review happened.

What "change management of supplier services" covers

This is often where gaps show, because it is about detecting drift. The guidance lists changes made by the supplier (new services or systems, revised policies, new controls) and changes in the service (networks, new technologies or versions, a moved service facility, a change of sub-suppliers, new subcontracting). In practice that also means a new subprocessor or region, an edited DPA, a lapsed certification or an acquisition. Each can alter your risk exposure without your own configuration changing, so manage each as it happens.

What an auditor may ask for on 5.22

Auditors rarely stop at your supplier policy. They commonly sample some suppliers and ask for records showing the control operated. Records worth having ready for each:

  • The supplier review record — a dated artefact showing the last review, what was examined, and what was decided. A named owner and a next-review date raise its credibility.
  • The change log — a chronological record of changes to that supplier's service, subprocessors, data locations, certifications and agreements, each with the date you became aware of it and what you did in response.
  • The trigger — evidence of what started a given review. Scheduled cadence is one trigger; a detected change is the stronger one, because it shows monitoring is live rather than calendar-driven.

The hard part is the change log. It is straightforward to show you reviewed a supplier on a schedule. It is much harder to prove that when a supplier added a subprocessor or moved data to a new region, you detected it on a specific date. A change log with no entry for a change the supplier announced on its own website is a gap, however polished your review minutes look.

This is where an external detection layer earns its place in the evidence pack. Venpo monitors each vendor's published legal documents on a schedule — Terms, Privacy Policy, DPA, cookie policy and subprocessor list — and turns every detected change into a dated, versioned redline showing exactly what text changed and when. That timestamped record is corroborating evidence that you detected a supplier-side change on a date, which is precisely what the change log an auditor samples is meant to contain. It complements your own supplier-review process; it does not replace it.

How often to monitor and review

The standard says only “regularly”, with no fixed frequency, so tie cadence to the risk each supplier carries. Set the tier from the data the supplier handles and how central it is to your service, then attach a cadence to each tier.

  • Critical suppliers (hold regulated or large-volume personal data, or underpin a core service): a formal review at least annually, often semi-annually, with continuous monitoring of their public posture in between and a review triggered on any material change.
  • Important but non-critical suppliers: a formal review annually, with monitoring of certification status and major disclosures.
  • Low-risk suppliers (little or no access to sensitive data): a lighter periodic check, often every 12 to 24 months, is usually proportionate.

Keep the two activities distinct. Continuous monitoring is always-on detection between reviews — its job is to catch a change the day it appears, not months later. Periodic review is the scheduled, documented assessment that produces the review artefact. A programme with only periodic review has long blind windows between assessments; a programme with only monitoring generates signals but never the decision record an auditor samples. Good practice uses both, and cadence should tighten as monitoring surfaces more change at a supplier.

Where 5.22 breaks down in practice

The dominant failure mode is not missing due diligence — it is due diligence that stops. Most organisations assess a supplier thoroughly at onboarding: they collect the SOC 2, check the ISO certificate, read the DPA, record a risk rating in a spreadsheet, and sign. Then nothing detects what changes afterward. The certificate expires and no one notices until the next annual review a full year later; a subprocessor is added and the DPA is never re-read; data quietly moves region. The onboarding assessment ages into a document that describes a supplier who no longer exists.

This is the decaying-spreadsheet problem, and auditors may look for it. The row says "SOC 2 reviewed" against a date eighteen months old, while the report it refers to lapsed eight months ago. The subprocessor list in the file is three versions behind the one live on the supplier's site. The control fails not because the review was bad, but because there was no mechanism to detect drift between reviews — so the change log has gaps that exactly match the periods when something changed.

Closing the gap means treating detection as a running process rather than an annual task: a live watch on each supplier's public posture that timestamps changes as they happen, feeding a change log that stays current between reviews. That is the specific, narrow slice Venpo automates for the publicly observable surface — a new subprocessor, an edited DPA clause, a data location that changes in a published document, a rewritten privacy or security policy — so the record an auditor samples reflects the supplier as they are today, not as they were at signing.

Point-in-time due diligence
supplier-review-tracker.xlsx
Reviewed once at onboarding. Nothing tells you what changed since.
Cloud host — SOC 2 on file14 mo ago
Data warehouse — DPA signed2 yr ago
Email provider — subprocessors OK18 mo ago
Continuous evidence
Dated change record
A change to a published document, caught on the next read and dated.
Subprocessor list — new entry addedJun 2
DPA — processing region changedMay 19
Privacy policy — retention clause rewrittenApr 30

Illustrative — not vendor data

Supplier-side change Why it is a 5.22 trigger
Supplier adds a new subprocessor to its published list A new subprocessor extends the chain of parties touching your data to one you never assessed. 5.22 names a change of sub-suppliers as a change to detect and manage; in practice you then evaluate the new processor and check it against the sub-processing terms you agreed under 5.20 and 5.21.
Subprocessor moves processing or storage to a new country or region A new data location can change the transfer mechanism you rely on (for example for an EU-to-US transfer). The exposure changes even though your own systems did not, so the move must be captured and reviewed.
Supplier's ISO 27001 or SOC 2 attestation lapses or is not renewed The assurance you relied on at signing has expired. 5.22 expects you to review the independent audit reports you depend on, so a monitoring programme should surface the lapse promptly and prompt you to obtain the renewed report or reassess residual risk, rather than discover it a year later at the annual review.
Supplier edits a clause in its Data Processing Agreement A changed DPA clause — retention, sub-processing rights, security measures, breach-notification timing — silently rewrites the terms you agreed to. Detecting the specific edit is the evidence that change management operated on the agreement.
Supplier is acquired or changes ownership New ownership can change data-handling practices, hosting, sub-suppliers and the entity controlling your data. The standard's change list does not name acquisitions specifically, but an ownership change usually drives several changes that are named — sub-suppliers, service facilities, policies — so mature programmes treat it as a trigger for a fresh review.
Supplier rewrites its published security policies or materially changes the service A changed security policy, altered authentication defaults, or a shift in service scope can raise or lower the protection around your data, making it a trigger to reassess whether the agreed security level still holds.
Supplier discloses a security incident or breach affecting your data An incident is direct evidence the supplier's posture has moved. 5.22's guidance has you review incident information and manage the incident; then decide if the relationship's risk is still acceptable.

Recent subprocessor-list and DPA changes Venpo recorded on vendors with a public page — the kind of post-signing change 5.22 asks you to manage. Each links to the dated, verified record.

How often should we review a critical supplier under 5.22?

For a supplier that handles regulated or high-volume personal data or underpins a core service, run a formal, documented review at least annually; many programmes move critical suppliers to a semi-annual cadence. Between reviews, monitor their public posture continuously so a material change triggers an out-of-cycle review rather than waiting for the calendar. The standard says only “regularly”; a risk-based frequency is how you justify yours.

Does a supplier adding a new subprocessor count as a change under 5.22?

Yes. A new subprocessor extends the chain of parties that touch your data to one you did not assess, so it is a textbook 5.22 change event. You need to detect the addition, check it against your DPA's sub-processing terms, and record what you did about it. A dated record of catching it is strong evidence.

What evidence actually proves we caught a supplier change?

A dated entry in a change log showing what changed, when you became aware of it, and your response — ideally backed by an artefact such as a versioned diff of the supplier's subprocessor list or DPA. The credible signal is the date of detection: it shows monitoring is live rather than reconstructed after the fact. A review that only records 'no material changes' with no evidence of how you looked is weak.

Who owns control 5.22?

Accountability usually sits with whoever owns the third-party or supplier-risk process — often a vendor risk manager, procurement lead, or the security and ISMS team — with the relationship or contract owner responsible for acting on findings. What matters for the audit is that ownership is explicit and that the same owner is accountable for both the scheduled review and the response to detected changes. Diffuse ownership is a common reason the change log develops gaps.

Is 5.22 different from the onboarding due diligence in 5.19?

Yes, and conflating them is the most common weakness. Control 5.19 sets your overall approach to supplier-security risk and 5.20 puts the security terms into the agreement; 5.22 governs everything after signing — keeping the agreed level of security and service intact as the supplier's service and posture change. Strong onboarding does not satisfy 5.22, because the control is specifically about ongoing detection and review.

Can we satisfy 5.22 with an annual questionnaire?

Rarely on its own. A once-a-year questionnaire leaves a long blind window in which subprocessors, data locations, certifications and DPA terms can all change undetected, and it relies on the supplier self-reporting. An auditor may ask how you would have known if a subprocessor, data location or certification had changed between reviews — and a questionnaire does not answer that. Pair periodic review with continuous monitoring so changes are caught when they happen.

How does 5.22 handle a supplier certification expiring?

A lapsed ISO 27001 certificate or stale SOC 2 report removes assurance. 5.22 expects you to review the independent audit reports you depend on, so your monitoring should surface the expiry promptly and prompt you to obtain the renewed report or reassess residual risk. Tracking certification validity dates in your supplier register, and watching the supplier's published security and compliance documents for changes, is the practical mechanism. Discovering the lapse a year later at the annual review is the gap ongoing monitoring closes.

Where does an external monitoring tool like Venpo fit into 5.22?

It automates detection for the publicly observable slice of supplier change — subprocessor lists, data-processing agreements, privacy and cookie policies, terms of service and published security policies — by re-reading those pages on a schedule and producing a dated, versioned redline of exactly what changed. That timestamped record is corroborating evidence for the change log an auditor samples. It complements your own supplier-review, contract and questionnaire process rather than replacing it, and it does not assess a supplier's internal controls or certify anyone.

Organizational controls 37

2022 Control 2013
5.1 Policies for information security 5.1.1, 5.1.2
5.2 Information security roles and responsibilities 6.1.1
5.3 Segregation of duties 6.1.2
5.4 Management responsibilities 7.2.1
5.5 Contact with authorities 6.1.3
5.6 Contact with special interest groups 6.1.4
5.7 Threat intelligence —
5.8 Information security in project management 6.1.5, 14.1.1
5.9 Inventory of information and other associated assets 8.1.1, 8.1.2
5.10 Acceptable use of information and other associated assets 8.1.3, 8.2.3
5.11 Return of assets 8.1.4
5.12 Classification of information 8.2.1
5.13 Labelling of information 8.2.2
5.14 Information transfer 13.2.1, 13.2.2, 13.2.3
5.15 Access control 9.1.1, 9.1.2
5.16 Identity management 9.2.1
5.17 Authentication information 9.2.4, 9.3.1, 9.4.3
5.18 Access rights 9.2.2, 9.2.5, 9.2.6
5.19 Information security in supplier relationships 15.1.1
5.20 Addressing information security within supplier agreements 15.1.2
5.21 Managing information security in the ICT supply chain 15.1.3
5.22 Monitoring, review and change management of supplier services 15.2.1, 15.2.2
5.23 Information security for use of cloud services —
5.24 Information security incident management planning and preparation 16.1.1
5.25 Assessment and decision on information security events 16.1.4
5.26 Response to information security incidents 16.1.5
5.27 Learning from information security incidents 16.1.6
5.28 Collection of evidence 16.1.7
5.29 Information security during disruption 17.1.1, 17.1.2, 17.1.3
5.30 ICT readiness for business continuity —
5.31 Legal, statutory, regulatory and contractual requirements 18.1.1, 18.1.5
5.32 Intellectual property rights 18.1.2
5.33 Protection of records 18.1.3
5.34 Privacy and protection of PII 18.1.4
5.35 Independent review of information security 18.2.1
5.36 Compliance with policies, rules and standards for information security 18.2.2, 18.2.3
5.37 Documented operating procedures 12.1.1

People controls 8

2022 Control 2013
6.1 Screening 7.1.1
6.2 Terms and conditions of employment 7.1.2
6.3 Information security awareness, education and training 7.2.2
6.4 Disciplinary process 7.2.3
6.5 Responsibilities after termination or change of employment 7.3.1
6.6 Confidentiality or non-disclosure agreements 13.2.4
6.7 Remote working 6.2.2
6.8 Information security event reporting 16.1.2, 16.1.3

Physical controls 14

2022 Control 2013
7.1 Physical security perimeters 11.1.1
7.2 Physical entry 11.1.2, 11.1.6
7.3 Securing offices, rooms and facilities 11.1.3
7.4 Physical security monitoring —
7.5 Protecting against physical and environmental threats 11.1.4
7.6 Working in secure areas 11.1.5
7.7 Clear desk and clear screen 11.2.9
7.8 Equipment siting and protection 11.2.1
7.9 Security of assets off-premises 11.2.6
7.10 Storage media 8.3.1, 8.3.2, 8.3.3, 11.2.5
7.11 Supporting utilities 11.2.2
7.12 Cabling security 11.2.3
7.13 Equipment maintenance 11.2.4
7.14 Secure disposal or re-use of equipment 11.2.7

Technological controls 34

2022 Control 2013
8.1 User endpoint devices 6.2.1, 11.2.8
8.2 Privileged access rights 9.2.3
8.3 Information access restriction 9.4.1
8.4 Access to source code 9.4.5
8.5 Secure authentication 9.4.2
8.6 Capacity management 12.1.3
8.7 Protection against malware 12.2.1
8.8 Management of technical vulnerabilities 12.6.1, 18.2.3
8.9 Configuration management —
8.10 Information deletion —
8.11 Data masking —
8.12 Data leakage prevention —
8.13 Information backup 12.3.1
8.14 Redundancy of information processing facilities 17.2.1
8.15 Logging 12.4.1, 12.4.2, 12.4.3
8.16 Monitoring activities —
8.17 Clock synchronization 12.4.4
8.18 Use of privileged utility programs 9.4.4
8.19 Installation of software on operational systems 12.5.1, 12.6.2
8.20 Networks security 13.1.1
8.21 Security of network services 13.1.2
8.22 Segregation of networks 13.1.3
8.23 Web filtering —
8.24 Use of cryptography 10.1.1, 10.1.2
8.25 Secure development life cycle 14.2.1
8.26 Application security requirements 14.1.2, 14.1.3
8.27 Secure system architecture and engineering principles 14.2.5
8.28 Secure coding —
8.29 Security testing in development and acceptance 14.2.8, 14.2.9
8.30 Outsourced development 14.2.7
8.31 Separation of development, test and production environments 12.1.4, 14.2.6
8.32 Change management 12.1.2, 14.2.2, 14.2.3, 14.2.4
8.33 Test information 14.3.1
8.34 Protection of information systems during audit testing 12.7.1

Evidence supplier monitoring without the spreadsheet

Venpo watches your vendors’ terms, DPAs and subprocessor lists and dates every change — dated evidence for your 5.22 change log.

Start for free →